logo

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Aluminium Scaffold Tower
Created with Pixso.

Bridge Inspection Cantilever Aluminium Scaffold Tower Deck-Level Extended Platform Tie-Back Anchor Laser Mount

Bridge Inspection Cantilever Aluminium Scaffold Tower Deck-Level Extended Platform Tie-Back Anchor Laser Mount

Detail Information
Material:
Aluminum Alloy 6082-T6
Platform Size:
2.0m X 0.6m + Cantilever
Working Height:
2m - 8m Above Deck
Cantilever Extension:
Up To 1.2m Beyond Parapet
Tie-Back:
4-Point Steel Wire Rope Turnbuckle
Laser Mount:
3-Axis Adjustable Bracket
Camera Rail:
Full Cantilever Edge T-Slot
Tube Wall:
3.2mm
Cantilever Load:
150 Kg Including Personnel
Surface Treatment:
Anodized Silver
Wheel Type:
200mm Lockable With Chocks
Highlight:

aluminium scaffold tower with extended platform

,

bridge inspection scaffold tower with tie-back anchor

,

aluminium scaffold tower with laser mount

Product Description
The Bridge Inspection Economic Model

Highway authorities and infrastructure asset managers operate within increasingly constrained inspection budgets while facing expanding asset portfolios as infrastructure networks age. A single under-bridge inspection unit (UBIU) mobilization for a routine principal inspection costs between £2,500 and £5,000 per day, requires two lanes of traffic management at approximately £800 per day, and typically achieves 4-6 hours of productive inspection time within an 8-hour traffic management window due to setup and demobilization overhead. For bridges where the critical inspection areas are within 8 meters of deck level—bearing shelves, expansion joints, deck soffit edges, and parapet beam connections—the Bridge Inspection Cantilever Tower provides an alternative access methodology that eliminates the UBIU mobilization cost, reduces traffic management requirements from lane closures to shoulder narrowing, and extends productive inspection time to a full 8-hour working day.

Whole-Life Cost Comparison: UBIU vs. Cantilever Tower

A comparative whole-life cost analysis for a hypothetical highway authority managing 120 bridges requiring biennial principal inspections demonstrates the economic case. Of these 120 structures, approximately 45 (37.5%) have critical inspection areas within 8 meters of deck level where cantilever tower access is applicable. Current practice using UBIU access for these 45 bridges costs approximately £148,500 per inspection cycle (£3,300 average UBIU day rate including traffic management × 45 bridges), or £297,000 per biennial cycle. The capital cost of three cantilever tower units with training and certification is approximately £28,500, with annual maintenance and recertification costs of £3,200. Amortized over a 10-year service life with five biennial inspection cycles, the cantilever tower approach delivers a total cost of £60,500 versus £1,485,000 for UBIU access—a 96% cost reduction. Beyond the direct cost comparison, the cantilever tower approach eliminates the 6-8 week UBIU scheduling lead time, enabling reactive inspections following extreme weather events or vehicle impact incidents that would otherwise wait for UBIU availability.

Key Features
  • 96% Whole-Life Cost Reduction vs UBIU: 10-year cost comparison: £60,500 for cantilever tower fleet versus £1,485,000 for UBIU access across 45 applicable bridges, with additional benefit of eliminating 6-8 week UBIU scheduling lead times.
  • Traffic Management Reduction: Lane Closure to Shoulder Narrowing: Cantilever tower deployment from bridge deck eliminates the two-lane closure requirement of UBIU operations, reducing traffic management costs approximately 75% and minimizing road user disruption.
  • Calibrated Tie-Back Anchor System: Torque-limiting turnbuckle tensioners on 4-point steel wire rope assemblies provide consistent preload with LOLER-certified proof-load test certificates, preventing both under-tension (displacement risk) and over-tension (frame damage).
  • 3-Axis Laser Measure Mounting Bracket: Platform-mounted bracket with standard survey instrument thread enables stable crack width and deflection monitoring, eliminating the measurement variability of handheld instruments on bridge decks with live traffic vibration.
  • Full-Shift Productive Inspection Time: 8-hour continuous inspection capability versus 4-6 hours for UBIU within traffic management windows, representing a 33-100% increase in daily inspection productivity.
  • Epoxy-Anchored Deck Tie-Back Installation Kit: Included kit enables permanent bridge deck anchor point installation during first deployment, with subsequent inspections requiring only tower setup without repeated drilling operations.
Technical Specifications
ParameterSpecification
Cantilever ExtensionUp to 1.2m Beyond Parapet
Platform Dimensions2.0m x 0.6m + Cantilever
Working Height Range2m - 8m Above Deck
Tie-Back System4-Point Steel Wire Rope Turnbuckle
Tie-Back Tension ControlCalibrated Torque-Limiting
Laser Mount3-Axis (Standard Survey Thread)
Camera RailFull Cantilever Edge T-Slot
Mounting SystemT-Slot Compatible (M8)
Material Grade (Tubes)Aluminum Alloy 6082-T6
Tube Diameter50.8mm
Tube Wall3.2mm
Cantilever Load150 kg Including Personnel
Surface TreatmentAnodized Silver
Wheel200mm Lockable with Chocks
StandardsEN1004:2004, BA 62/18
Packaging and Quality Assurance

Cantilever platform, triangulated brace, and tie-back anchor system in dedicated road-case package. Steel wire rope assemblies individually proof-loaded with LOLER test certificates. Tie-back anchor installation kit with four epoxy-anchor bolt sets for permanent deck anchor point installation included. 24-month structural warranty, 12-month tie-back warranty, annual re-certification service available.