Brand Name: | LEADER |
Model Number: | FRP Fiberglass scaffold |
Price: | $1,500.00/sets >=1 sets |
Supply Ability: | 25 Set/Sets per Month youngman grp tower |
Building Construction/Zone 1-Explosive Atmosphere Risk Area Grp Fiberglass Scaffold Tower
Please note that 'LEADER' FRP Scaffolding are made of top grading FRP material. The tube are made of polyester resin+fiberglass which is lighter and give strongest strength with the same tube.
All the components / clamp / couplers are made by nylon+fiberglass which are unbreakable to normal impact with hardest surface. Existing many suppliers/makers using less strength PVC material for most components while using epoxy+fiberglass for the tube, considering material price is probably 2~3 times difference while quality and strength performance unstable.
'LEADER' FRP scaffold can build up much stable, higher height but more safety scaffold even outside the range of EN1004.2004.
Product Name: |
Leader Fiberglass Mobile Scaffold Towers |
Scaffolding Type: |
Ladder Frame Mobile Scaffold |
Place of Origin: |
Guangzhou China |
Material |
Fiberglass |
Main Tube |
Tube Wall Thickness: 2.8MM; Pipe Diameter: 50.6MM |
Size(WxL) |
0.75m(W)*2.0m/2.5m(L); 1.35m(W)*2.0m/2.5m(L) 0.85m(W)*1.8m/2.5m(L); 1.45m(W)*1.8m/2.5m(L) |
Height |
2-12m |
Floors |
3 floor,4floor,5floor is up to you |
Colour |
Orange |
Load Capacity |
200kg/sqm |
Certification |
CE Certification |
Standard |
EN1004 |
Application |
Used in Electrical Engineering, Railway and Power Generation Engineering Work, Chemical Industry, Food, Medical and Drug Manufacturer. |
Prominent Features
For Zone 1 —— Explosive Atmosphere Risk Area
1. Non-Conductive
2.Corrosive Resistance
3. Anti-Oxidising
4. Non-Sparking
Detailed Images
Best in Structure
1. Structural components made by fiberglass Reinforce Nylon material with High Yield Stress and strain to resist strong impact force.
2. Main tube made by fiberglass reinforce resin material with high tensile strength.
3. Insulation scaffolding for easy operation, safest and highest rigidity utilizing worldwide.
Non-Decending Joints
Patented unique stable wedge design assures Anti-Fall Connection with Superior Stable Fail Safe Performance distinguished overwhelms any other similar products.
Diagonal Struts
Built in diagonal struts minimize frame deformation and enable additional rigidity and best stability.
Innovative Patented Mobile Fiberglass Scaffold Tower with European CE certification ensures product deflection according to DIN4422, DIN4420 and design comply with European Standard EN1004:2004, certified by China National Electric Industry Quality Safety Equipment Control & Testing Centre.
Moreover, Leader's factory achieved certification with ISO 9001 International Quality Management Standard to evidence and guarantee this optimum Fiberglass Mobile Scaffold Tower System offer excellent stable performance with highest safety.
Guangzhou Leader Equipment Ltd. is a manufacturer with enormous experience proven expertise and capabilities in manufacturing and supplying Formwork and Scaffolding Systems. All products have Self Owned Patents, these include Leader’s SGF Superb Formwork System, GN50 Omni Scaffolding System, AMP Aluminium Prop & Panel Slab Formwork System, FRP Fiberglass Mobile Scaffold Towers, Aluminium Protection Net System, and also Personnel Access Equipment etc.
Our scaffold and formwork will be strictly inspected before packing and shipping out to insure that they could be satisfied with you.
Q: Are you a factory or trading company?
A: Professional Factory
Q: Where is your factory located? How can I visit there?
A: Leader is located in Guangzhou City, China, It takes only 40 minutes drive from Bai Yun International Airport. You are welcome to visit us!
Q: What is your product range?
A: Guangzhou Leader Equipment Ltd. is a manufacturer specialize in professional design and production of GN50 Aluminum & Steel Scaffold, Fiberglass Scaffolding, Aluminum Shoring & Slab Panel Formwork System, Superb Formwork System and Aerial Working Platforms etc.
Q: Do you accept OEM?
A: OEM is acceptable.
Q: What Payment terms do us accept?
A: T/T in advance (100%, 30% deposit+70% before shipment), LC.